POST-CONSTRUCTION
CLEANING FOR
GENERAL CONTRACTORS.
We do post-construction cleaning for general contractors across metro Atlanta — rough, final, and touch-up cleans quoted in writing, by phase, around your handover date.
I'm Ashton, I run Minty Clean ATL. If you run jobs in Atlanta, the clean is not an afterthought at the end of the schedule. It is the last phase before your client, your lender’s inspector, or your tenant walks the space — and it only works if it is planned like a phase, with dates, scope, and access settled before the last trade leaves. This page is how we work with GCs, and what a GC should expect from any cleaning sub, including us. The full service sits on our post-construction cleaning page.

What does a GC actually need from a cleaning sub?
A GC needs the clean to protect the handover date, not threaten it.
That means three things. The dates are real — the rough clean lands while trades can still work behind it, the final lands only after the last dust-making trade is out, and the touch-up lands as close to the walkthrough as the calendar allows. The scope is in writing before anyone shows up, so there is no argument on site about whether inside-the-cabinets or the window tracks were included. And the crew works to the building’s rules — freight elevator bookings, dock hours, parking, and sign-in — without the super having to manage them.
A cleaning sub should be one less thing on the super’s list, not one more. Dates, scope, and access settled up front are what make that true.
ROUGH.
FINAL. TOUCH-UP.
The rough clean clears debris, packaging, and heavy dust mid-project so the next trades can work and an owner can walk the job without tracking dust through finished areas.
- Rough clean — clears debris, packaging, and heavy dust mid-project so the next trades can work and an owner can walk the job clean
- Final clean — the detail pass: surfaces, glass, fixtures, cabinets inside and out, floors to their material, done once after work is truly done
- Touch-up — a short visit right before handover that handles the dust that settled after the final and whatever the punch-list walk stirred up
- Scoped and priced phase by phase — each phase is different work, so it should not carry the same weight in the budget
Why does the final clean so often get bought twice?
Because it gets scheduled before the work is actually finished.
One painter coming back for a half day of touch-ups, one cabinet adjustment, one drywall patch — any of them puts fine dust back on every flat surface the final clean just detailed. The space looks dusty again at the walkthrough, and the GC pays for a second final or eats the delay.
The fix is sequencing, not effort: hold the final until the punch list that makes dust is closed, run the HVAC for at least an hour beforehand so settled dust drops, then clean top to bottom, and hold a short touch-up for the morning of the walk. Our post-construction cleaning phases guide walks through that order in full, and our cleaning before a blue-tape walkthrough guide covers the walk itself.
What should be in the written scope?
Square footage and which spaces are in. Which phases, and the target date for each. What is included surface by surface — glass, tracks, cabinets, fixtures, floors, vents — and what is not. The building’s access rules and who books the elevator and dock. What happens if a trade has to come back after the final — who pays for the re-clean, and how fast it can be rescheduled. And the guarantee terms in plain words: at Minty, if something in scope was genuinely missed, tell us within 24 hours and we come back and re-clean it free.
A scope that fits in an email thread and gets "confirmed" on a call is where most disputes start. Get it as a document, signed off by both sides, before the first phase. Our post-construction cleaning checklist shows the surface-by-surface level a written scope should reach.
What can delay a clean on a GC’s job?
Trades still on site making dust. No water or power yet in a space that needs both. Elevator or dock time that was never booked in a Midtown or Buckhead tower. Floors that were finished the day before and cannot take foot traffic or water yet. And the walkthrough date moving up without the clean moving with it.
Most of these are visible a week out — which is why we ask for the handover date and the last-trade date at quote time, not the week of. Heavy or structural haul-off is a separate conversation from the clean itself — our construction debris removal guide covers that side, so the clean is not priced like a haul.
How much notice does a GC need to give?
A few days is workable for a rough or a touch-up. For a final on a large space, a week is better — it lets the phases line up against the punch list instead of colliding with it. If the date has already collapsed, call anyway. A short, honest conversation about what can actually be done in the window beats a crew booked for a final that the schedule will undo.
What we need from you to quote a job is five things: the address, the square footage, which phases you need, the last-trade date, and the handover date. With those five things we can walk the sequencing with you and put the scope in writing. How the number itself is built is explained in our post-construction cleaning cost guide — each phase is scoped on its own, in writing, before anyone shows up.
What happens if a trade has to come back after the final?
Then the final was early, and the honest move is a touch-up after that trade is out — not a second full final. We will tell you that on the call rather than sell you the bigger job. That is the same sequencing point as above, stated from the other side: the clean follows the work, and when the work moves, the honest answer is to move the right phase, not to sell the biggest one again.
Building rules get the same treatment. Freight elevator and dock bookings, sign-in, parking, and hours are part of the scope conversation before we quote, not a surprise on the day — in towers and managed buildings across Midtown, Buckhead, and the rest of the metro, that conversation is what keeps a clean from colliding with the building itself. Packaging and light debris come out in the rough phase; heavy or structural haul-off stays a separate job, arranged on its own, so the phases a GC is actually buying stay clean and readable in the written scope.
Running a job toward handover in Atlanta?
Running a job toward handover in Atlanta and the dust is the last thing standing between you and the walk? Call Minty Clean ATL at (678) 562-5636 — tell us the last-trade date and the handover date, and we will line the phases up against both and put the scope in writing. Open 7am to 7pm, seven days a week.
So fresh. So minty.

General contractor cleaning FAQs
Do you quote by phase or as one number?
By phase, in writing. Rough, final, and touch-up are scoped separately, so you can see what each one costs and drop or move a phase without reopening the whole quote.
What if a trade has to come back after the final clean?
Then the final was early, and the honest move is a touch-up after that trade is out — not a second full final. We will tell you that on the call rather than sell you the bigger job.
Can you work around building rules in towers and managed buildings?
Yes — freight elevator and dock bookings, sign-in, parking, and hours are part of the scope conversation before we quote, not a surprise on the day.
Do you handle the debris and leftover material too?
Packaging and light debris come out in the rough phase. Heavy or structural haul-off is a separate conversation — junk removal can be arranged as its own job so the clean is not priced like a haul.
What do you need from us to quote a job?
The address, the square footage, which phases you need, the last-trade date, and the handover date. With those five things we can walk the sequencing with you and put the scope in writing.
What if something in scope gets missed?
Tell us within 24 hours and we come back and re-clean it free. That is the Minty 24-Hour Promise, and it is in the written scope, not just on this page.
LET’S TALK CLEAN.
Goodbye mess. Hello Minty.Tell us the address, the square footage, which phases you need, the last-trade date, and the handover date, and we’ll line the phases up against both and put the scope in writing. Open 7am to 7pm, seven days a week, across Atlanta and surrounding areas.
Or call (678) 562-5636